Job Description
Job Description
Top Skills' Details
1. 5+ years as a cell site of field tech
2. Ericsson experience (Must Have)
3. Projects include Macro's + Small Cell
4. Verizon experience nice to have
Job Description
Projects Supported : Small Cell 5G Only
Small Cell 4G Only
Small Cell 4G & 5G (C-Band or 5GmmWave)
ODAS Node
IDAS Node
Macro New Build (assumes 4G and C-Band)
Macro Carrier Add (includes C-Band)
Macro RELO
Macro Drop & Swap
Macro C-Band Prep / Conversion
Macro Sector Add
Baseband Upgrade
The below tasks cover the major projects :
Small Cell, IDAS, ODAS 5G Milestone Integration Tasks
- Order License Key File (LKF) via IOP
- Import LKF to Ericsson Network Manager (ENM) via IOP
- Generate SiteInstall file (integration file) via IOP
- Install SiteInstall file onto 5G radio
- Once integration file reaches 65% install completion, click on the integrate icon
- When integration file reaches 100%, the radio is ready to verify connectivity to ENM
- Use ENM Scripting Server to verify that the ENM and radio are communicating
- Verify node is synchronized
- Verify node is on the latest software version, if not upgrade via ENM
- Run Post Integration Script via ENM Scripting Server
- Run Post Upgrade Script via ENM Scripting Server
- Verify PTP timing
- Repeat above steps for each 5G radio
- Assuming there are no issues, hand over the project to System Performance (SP) to build anchors and run their scripts
- SP will hand the project back to NA to finalize the activations process
- Test all radio / sectors and do speed and ping tests
- Enter testing data into IOP
- Complete all IOP Quality Check List Tasks
- Activate Call Signs in IOP [FINAL TASK & PAY POINT)
Small Cell, IDAS, ODAS 4G Milestone Integration Tasks
Verify power, SFP, and overall Hub readiness to integrate baseband (reference RiPort Map)Order License Key File (LKF) via IOPImport LKF to Ericsson Network Manager (ENM) via IOPGenerate SiteInstall file (integration file) via IOPInstall integration file onto basebandOnce integration file reaches 65% install completion, click on the integrate iconWhen integration file reaches 100%, the baseband is ready to verify connectivity to ENMUse ENM Scripting Server to verify that the ENM and baseband are communicatingVerify node is synchronizedVerify node is on the latest software version, if not upgrade via ENMRun Post Integration Script via ENM Scripting ServerRun Post Upgrade Script via ENM Scripting ServerRun 4X scripts in SAT Tool (if not done via the install files)Verify PTP timingCheck RSSI on each radio / sectorVerify light levels on fiberAssuming there are no issues, hand over the project to System Performance (SP) to build Golden Parameters and run their scriptsSP will hand the project back to NA to finalize the activations processPerform E911 testingComplete all IOP Quality Check List TasksActivate Call Signs in IOP [FINAL TASK & PAY POINT)Macro New Build, RELO and Drop-and-Swap 4G & C-Band Milestone Integration Tasks
Verify power, SFP, and overall Hub readiness to integrate baseband (reference RiPort Map)Verify fiber pathIntegrate IXRe at cell site (work with MSC)Order License Key File (LKF) via IOPImport LKF to Ericsson Network Manager (ENM) via IOPGenerate SiteInstall file (integration file) via IOPInstall integration file onto basebandOnce integration file reaches 65% install completion, click on the integrate iconWhen integration file reaches 100%, the baseband is ready to verify connectivity to ENMUse ENM Scripting Server to verify that the ENM and baseband are communicatingVerify node is synchronizedVerify node is on the latest software version, if not upgrade via ENMRun Post Integration Script via ENM Scripting ServerBuild ERAN via feature activation tool for carrier aggregationRun Post Upgrade Script via ENM Scripting ServerRun 4X scripts in SAT Tool (if not done via the install files)Verify PTP timingBuild RETs via IOP (scan & troubleshoot with tower crew if not visible in IOP)Check RSSI on each radio / sectorVerify light levels on fiberAssuming there are no issues, hand over the project to System Performance (SP) to build Golden Parameters and run their scriptsSP will hand the project back to NA to finalize the activations processPerform E911 testingDrive test site and test all sectors, to include speed testsComplete all IOP Quality Check List TasksPunch down environmental alarmsUpdate FUZE Compliance (hazard materials on site)Apply stickers and signageInstall and wire up Centeron Fuel MonitorActivate Call Signs in IOP [FINAL TASK & PAY POINT)Macro Carrier Add C-Band Modification Milestone Integration Tasks
Verify power, SFP, and overall Hub readiness to integrate baseband (reference RiPort Map)Integrate IXRe at cell site (work with MSC)Order License Key File (LKF) via IOPImport LKF to Ericsson Network Manager (ENM) via IOPWork with tower crew for radio swap out (RUL / RUS to 4449 and / or 8843)Use scripting tool and SAT Tool to add and delete radios from existing basebandGenerate SiteInstall file (integration file) via IOPInstall integration file onto new baseband (6648)Once integration file reaches 65% install completion, click on the integrate iconWhen integration file reaches 100%, the baseband is ready to verify connectivity to ENMUse ENM Scripting Server to verify that the ENM and baseband are communicatingVerify node is synchronizedVerify node is on the latest software version, if not upgrade via ENMRun Post Integration Script via ENM Scripting ServerBuild ERAN via feature activation tool for carrier aggregationRun Post Upgrade Script via ENM Scripting ServerRun 4X scripts in SAT Tool (if not done via the install files)Verify PTP timingBuild RETs via IOP (scan & troubleshoot with tower crew if not visible in IOP)Check RSSI on each radio / sectorVerify light levels on fiberAssuming there are no issues, hand over the project to System Performance (SP) to build Golden Parameters and run their scriptsSP will hand the project back to NA to finalize the activations processDrive test site and test all sectors, to include speed testsPerform E911 test (if required…usually at a 700MHZ only site getting upgraded)Complete all IOP Quality Check List TasksPunch down environmental alarmsUpdate FUZE Compliance (if any new hazard materials were added to site)Apply stickers and signage (for new cabinets)Activate Call Signs in IOP [FINAL TASK & PAY POINT)