Talent.com
Cell Site Integrator

Cell Site Integrator

TEKsystemsBroward County, FL, US
30+ days ago
Job type
  • Full-time
Job description

Job Description

Job Description

Top Skills' Details

1. 5+ years as a cell site of field tech

2. Ericsson experience (Must Have)

3. Projects include Macro's + Small Cell

4. Verizon experience nice to have

Job Description

Projects Supported : Small Cell 5G Only

Small Cell 4G Only

Small Cell 4G & 5G (C-Band or 5GmmWave)

ODAS Node

IDAS Node

Macro New Build (assumes 4G and C-Band)

Macro Carrier Add (includes C-Band)

Macro RELO

Macro Drop & Swap

Macro C-Band Prep / Conversion

Macro Sector Add

Baseband Upgrade

The below tasks cover the major projects :

Small Cell, IDAS, ODAS 5G Milestone Integration Tasks

  • Order License Key File (LKF) via IOP
  • Import LKF to Ericsson Network Manager (ENM) via IOP
  • Generate SiteInstall file (integration file) via IOP
  • Install SiteInstall file onto 5G radio
  • Once integration file reaches 65% install completion, click on the integrate icon
  • When integration file reaches 100%, the radio is ready to verify connectivity to ENM
  • Use ENM Scripting Server to verify that the ENM and radio are communicating
  • Verify node is synchronized
  • Verify node is on the latest software version, if not upgrade via ENM
  • Run Post Integration Script via ENM Scripting Server
  • Run Post Upgrade Script via ENM Scripting Server
  • Verify PTP timing
  • Repeat above steps for each 5G radio
  • Assuming there are no issues, hand over the project to System Performance (SP) to build anchors and run their scripts
  • SP will hand the project back to NA to finalize the activations process
  • Test all radio / sectors and do speed and ping tests
  • Enter testing data into IOP
  • Complete all IOP Quality Check List Tasks
  • Activate Call Signs in IOP [FINAL TASK & PAY POINT)

Small Cell, IDAS, ODAS 4G Milestone Integration Tasks

  • Verify power, SFP, and overall Hub readiness to integrate baseband (reference RiPort Map)
  • Order License Key File (LKF) via IOP
  • Import LKF to Ericsson Network Manager (ENM) via IOP
  • Generate SiteInstall file (integration file) via IOP
  • Install integration file onto baseband
  • Once integration file reaches 65% install completion, click on the integrate icon
  • When integration file reaches 100%, the baseband is ready to verify connectivity to ENM
  • Use ENM Scripting Server to verify that the ENM and baseband are communicating
  • Verify node is synchronized
  • Verify node is on the latest software version, if not upgrade via ENM
  • Run Post Integration Script via ENM Scripting Server
  • Run Post Upgrade Script via ENM Scripting Server
  • Run 4X scripts in SAT Tool (if not done via the install files)
  • Verify PTP timing
  • Check RSSI on each radio / sector
  • Verify light levels on fiber
  • Assuming there are no issues, hand over the project to System Performance (SP) to build Golden Parameters and run their scripts
  • SP will hand the project back to NA to finalize the activations process
  • Perform E911 testing
  • Complete all IOP Quality Check List Tasks
  • Activate Call Signs in IOP [FINAL TASK & PAY POINT)
  • Macro New Build, RELO and Drop-and-Swap 4G & C-Band Milestone Integration Tasks

  • Verify power, SFP, and overall Hub readiness to integrate baseband (reference RiPort Map)
  • Verify fiber path
  • Integrate IXRe at cell site (work with MSC)
  • Order License Key File (LKF) via IOP
  • Import LKF to Ericsson Network Manager (ENM) via IOP
  • Generate SiteInstall file (integration file) via IOP
  • Install integration file onto baseband
  • Once integration file reaches 65% install completion, click on the integrate icon
  • When integration file reaches 100%, the baseband is ready to verify connectivity to ENM
  • Use ENM Scripting Server to verify that the ENM and baseband are communicating
  • Verify node is synchronized
  • Verify node is on the latest software version, if not upgrade via ENM
  • Run Post Integration Script via ENM Scripting Server
  • Build ERAN via feature activation tool for carrier aggregation
  • Run Post Upgrade Script via ENM Scripting Server
  • Run 4X scripts in SAT Tool (if not done via the install files)
  • Verify PTP timing
  • Build RETs via IOP (scan & troubleshoot with tower crew if not visible in IOP)
  • Check RSSI on each radio / sector
  • Verify light levels on fiber
  • Assuming there are no issues, hand over the project to System Performance (SP) to build Golden Parameters and run their scripts
  • SP will hand the project back to NA to finalize the activations process
  • Perform E911 testing
  • Drive test site and test all sectors, to include speed tests
  • Complete all IOP Quality Check List Tasks
  • Punch down environmental alarms
  • Update FUZE Compliance (hazard materials on site)
  • Apply stickers and signage
  • Install and wire up Centeron Fuel Monitor
  • Activate Call Signs in IOP [FINAL TASK & PAY POINT)
  • Macro Carrier Add C-Band Modification Milestone Integration Tasks

  • Verify power, SFP, and overall Hub readiness to integrate baseband (reference RiPort Map)
  • Integrate IXRe at cell site (work with MSC)
  • Order License Key File (LKF) via IOP
  • Import LKF to Ericsson Network Manager (ENM) via IOP
  • Work with tower crew for radio swap out (RUL / RUS to 4449 and / or 8843)
  • Use scripting tool and SAT Tool to add and delete radios from existing baseband
  • Generate SiteInstall file (integration file) via IOP
  • Install integration file onto new baseband (6648)
  • Once integration file reaches 65% install completion, click on the integrate icon
  • When integration file reaches 100%, the baseband is ready to verify connectivity to ENM
  • Use ENM Scripting Server to verify that the ENM and baseband are communicating
  • Verify node is synchronized
  • Verify node is on the latest software version, if not upgrade via ENM
  • Run Post Integration Script via ENM Scripting Server
  • Build ERAN via feature activation tool for carrier aggregation
  • Run Post Upgrade Script via ENM Scripting Server
  • Run 4X scripts in SAT Tool (if not done via the install files)
  • Verify PTP timing
  • Build RETs via IOP (scan & troubleshoot with tower crew if not visible in IOP)
  • Check RSSI on each radio / sector
  • Verify light levels on fiber
  • Assuming there are no issues, hand over the project to System Performance (SP) to build Golden Parameters and run their scripts
  • SP will hand the project back to NA to finalize the activations process
  • Drive test site and test all sectors, to include speed tests
  • Perform E911 test (if required…usually at a 700MHZ only site getting upgraded)
  • Complete all IOP Quality Check List Tasks
  • Punch down environmental alarms
  • Update FUZE Compliance (if any new hazard materials were added to site)
  • Apply stickers and signage (for new cabinets)
  • Activate Call Signs in IOP [FINAL TASK & PAY POINT)